Nuremberg Hotel, Germany

Client: Private Sector – Germany
Status: Completed
Total Built Area: Approximately 30,000 m²
Function: Hotel

BIM-Based Project Modeling

Comprehensive Building Information Modeling (BIM) was implemented for the project, including detailed modeling of electrical and mechanical systems.

Clash Detection

All interdisciplinary conflicts within the project were identified, analyzed, and reported to the project management team for resolution.

Quantity Take-Off

Accurate quantity take-offs were performed, categorized according to the specific requirements of the project management team.

Shop Drawings Preparation

Shop drawings were developed following the detection and resolution of clashes to ensure precise execution on site.

Prefabricated Module Connection Plans

The project incorporated 44 prefabricated modules, and detailed connection drawings for these modules were produced and documented.

Project Images

Project Videos